Canadian breakfast at Westlakebridge


Second weekend of groundworks - the edge of the pond has been completely stabilized, involving two truckloads of soil and several tons of lava.

Saturday we kicked off with a real nice Canadian breakfast.

The edge


Stabilizing the edge of the pond : rolling out HDPE nets (Geocells) and filling these up with soil and lava. We had one side done by an excavator. The other sides had to be done by hand using wheelbarrows. A hell of a job.

Reflections 2


Blooming June berries reflect in the newly installed kitchen back panel.