Three pipes


Three cable pipes have been installed for water, power and telecom.

Sewage treatment


As there is no sewage network in the area, we need to take care of full sewage treatment ourselves. And being located close to a nature reserve and with the pond close-by, this is to be taken seriously.

Preliminary acceptance


Friday we signed for preliminary acceptance. The steel construction has finally been completed, - except for some minor details -.